Hi all,
Just done some minor updates at Gifford station. The bungalow that sits at the entrance to the station has been added (might get updated if I can get the 3D modeling software I need, as will the station building). The Goods platform has been reworked so that it no longer spawns passengers, still missing the crane though, again, if I can get a hold of the software, I'll make it.
Had a stupid incident with the old carriage that sits next to the station building at Gifford. A photograph of Gifford station after construction in 1901 showed that the station was very bland; no benches, no lamps, nothing other than the station building. A picture from 1910 shows the addition of benches, bins, bushes, lamps, and most notably, a 5-compartment carriage sitting next to the station building. To my surprise, I then found a picture of the station from 1952, 4 years after the station closed (due to a bridge near Humbie being destroyed because of floods), which shows a brick shelter (like the many already scattered around Gifford station) where the old carriage used to be.
So after removing the carriage and adding the brick shelter, I went back and looked at the 1910 photograph, thinking I was mistaken about the carriage only to find that I wasn't! And I had to add the carriage back in again.
Things that still need added at Gifford the goods crane, the water tank, and the platform bushes. When I can, I also hope add new building for the station bungalow and the station building, for upmost accuracy! Outside of Gifford, the Inglisfield level crossing still needs reworked to fit correctly, and Phase 2 still needs to be continued.
Showing posts with label Phase 1. Show all posts
Showing posts with label Phase 1. Show all posts
Monday, 22 February 2010
Monday, 15 February 2010
Oh!
Oops, almost forgot,
In my latest update, I'm now finishing with phase 1 of the grand masterplan.
Update 4 (15/2/10) - still no release
Phase 1 (92%)
[/] Decal Capturing and Laying
[/] Track Laying
[/] Platforms
[/] Elevation Mapping
[/] Roads and Rivers
[/] Buildings and Landmarks
Need to find an appropriate 1 story white bungalow
[/] Station Scenery
Individual bushes for station platform
[/] Trees, Foliage and Miscellaneous
[/] Railway Infrastructure
[X] Lineside Infrastructure
Fix level crossing issue
Found better water tank! Need supports.
[/] Industries
[-] Decal Removal and Landscape Texturing
[-] Final Iterations
Im now laying the set for Phase 2! Anyone, wondering when a release will be available, I plan to release a beta once Phase 3 is complete! Also when there is an indented list such as;
[X] Lineside Infrastructure
Fix level crossing issue
Found better water tank! Need supports.
The list is a listing of all the errors with that section and if anyone thinks they can help out with an error, do feel free to comment or email me (dannymckean@hotmail.co.uk). Also, any feedback is welcomed at the same pages.
Cheers all!
In my latest update, I'm now finishing with phase 1 of the grand masterplan.
Update 4 (15/2/10) - still no release
Phase 1 (92%)
[/] Decal Capturing and Laying
[/] Track Laying
[/] Platforms
[/] Elevation Mapping
[/] Roads and Rivers
[/] Buildings and Landmarks
Need to find an appropriate 1 story white bungalow
[/] Station Scenery
Individual bushes for station platform
[/] Trees, Foliage and Miscellaneous
[/] Railway Infrastructure
[X] Lineside Infrastructure
Fix level crossing issue
Found better water tank! Need supports.
[/] Industries
[-] Decal Removal and Landscape Texturing
[-] Final Iterations
Im now laying the set for Phase 2! Anyone, wondering when a release will be available, I plan to release a beta once Phase 3 is complete! Also when there is an indented list such as;
[X] Lineside Infrastructure
Fix level crossing issue
Found better water tank! Need supports.
The list is a listing of all the errors with that section and if anyone thinks they can help out with an error, do feel free to comment or email me (dannymckean@hotmail.co.uk). Also, any feedback is welcomed at the same pages.
Cheers all!
Subscribe to:
Posts (Atom)